Description:
The cylindrical look of a typical bollard has been re-imagined. Overlapping loops not only provide sculptural interest, they also allow the Spak to double as a bike rack.
Description:
The cylindrical look of a typical bollard has been re-imagined. Overlapping loops not only provide sculptural interest, they also allow the Spak to double as a bike rack.
Detailed Specifications:
Photo Gallery:
Spak Bollard cast ductile iron with black powdercoat finish.
Spak Bollard cast ductile iron with black powdercoat finish.
Spak Bollard cast ductile iron with black powdercoat finish.
Spak Bollard, pictured in a two-tone powder coat. Landscape Architect: Land Expressions. Project: Huntington Park, Spokane, WA. https://www.landexpressions.com/portfolio/commercial-projects/avistahuntington-park/
Spak Bollard, pictured in a two-tone powder coat. Landscape Architect: Land Expressions. Project: Huntington Park, Spokane, WA.https://www.landexpressions.com/portfolio/commercial-projects/avistahuntington-park/
Spak Bollard cast ductile iron with black powdercoat finish.
Spak Bollard, shown as surface mount. Cast ductile iron with two-tone powder coat finish. Project: Wall Street, Spokane, WA. Installed for City of Spokane by Bacon Concrete.
Spak Bollard, shown as surface mount. Cast ductile iron with two-tone powder coat finish. Project: Wall Street, Spokane, WA. Installed for City of Spokane by Bacon Concrete.
Spak Bollard, shown as surface mount. Cast ductile iron with two-tone powder coat finish. Project: Wall Street, Spokane, WA. Installed for City of Spokane by Bacon Concrete.
Spak Bollard, shown as surface mount. Cast ductile iron with two-tone powder coat finish. Project: Wall Street, Spokane, WA. Installed for City of Spokane by Bacon Concrete.
Spak Bollard, shown as surface mount. Cast ductile iron with two-tone powder coat finish. Project: Wall Street, Spokane, WA. Installed for City of Spokane by Bacon Concrete.
Standard Finish
For details, see Materials and Finish Options under Resources.
Optional Finish
For details, see Materials and Finish Options under Resources.
Optional Material Upgrades
Call for pricing and lead time.